The HDG K cascade 76-126 offers maximum operational reliability and top convenience in the medium power range.

Installation: In multi-boiler systems, the minimum distance between the boilers can be reduced to 120 mm by using the intermediate plate.

Example hydraulics: Both boilers are connected to a central accumulator. By means of HDG accumulator management, the lead boilers change automatically.
Pellet boilers are an established heating technology used in a wide range of applications. Depending on the building characteristics, heat demand and local conditions, they may represent an alternative to an existing oil heating system.
Depending on the applicable funding programmes and individual eligibility criteria, financial support may be available for the replacement of an oil heating system. The suitability of a pellet boiler should be assessed based on the specific project requirements.

For higher heat output requirements, HDG heating systems can be combined in a cascade configuration. The advantages of a cascade solution include a wide output range, reliable operation and heat supply tailored to demand, particularly where energy requirements fluctuate. With HDG, a cascade consists of two boilers connected to a common accumulator.
The HDG Compact cascade combines the output range of larger boiler systems with the flexibility of a multi-boiler configuration.
A cascade system is designed to match heat output to current demand. When heat demand is high, both boilers can operate simultaneously. When demand is lower, the boilers can operate alternately. This alternating operation can reduce operating hours per boiler and lower the thermal load on individual components, which can support their service life.
Using the HDG accumulator management system, the installed boilers are alternately assigned the role of lead boiler. As both boilers are designed to operate independently, one boiler can continue operating if the other is unavailable, subject to the system configuration and operating conditions.
Maintenance work can be carried out on one boiler while the second boiler remains in operation, provided system conditions allow this. If one boiler is unavailable, the second boiler can continue to supply heat to connected heating components within its available capacity.
Find out how easy it is to heat with the HDG and experience our flexible cascade solution as used by our customers